Add to Favorites
Share

Hydraulic Piling Frame System

  • Description
Product Detail

    As one of the leading hydraulic piling frame system manufacturer and equipped with a productive factory, Zhenjiang Zhenzhong Construction Machinery Co.,Ltd can offer you customized multi drilling machine, hydraulic walking pile driving frame, smw multi-shafts drilling rigs, concrete wall drilling machine, drill rig for smw method made in China in stock. Welcome to check the price with us.

    JZB240 pile driver machine Walking Piling Frame for pile foundation works
    JZB240 walking piling frame, jointly developed by beijing construction machinery comprehensive research institute and zhejiang zhenzhong construction machinery co.,ltd, is a new generation large-scale walking piling frame. The product features innovative design, rational structure, advanced technology, superior performance and stable and reliable application. It can be  applied to a variety of foundation construction, especially to meet the soil mixing wall method. It is the ideal and efficient equipment for the foundation construction of highways, bridges, ports, docks, subway stations and high-rise building.


    It has the following features
    1.stable and efficient piling frame system
    2.various power head, jackrod and drilling tool
    3.comfortable cab, convenient and simple operating system for single person
    4.convenient installation and transportation
    5.provide inductive load angle monitor and deep mixing pile monitor, which are conductive to conduct operation and construction management

    JZB240


    Height of mast

    39.52m

    Mast supporting mode

    3-point supporting type

    Mast inclination

    Forward12°

    Backward 5°

    Travel mode

    Walking type

    Lateral Travel speed

    2.9/4.8m/min

    Lengthways Travel speed

    1.5/2.9m/min

    Overall dimensions in operation

    15.35m×9.6m×42.25m

    Max. Extraction Force

    710 kN

    Main Winch pull(1st layer)

    91.5 kN

    Rope diameter

    21.5mm

    Drum capacity

    550m

    Winding speed

    0~26 m/min

    Auxiliary winch pull(1st layer)

    72 kN

    Rope diameter

    20mm

    Drum capacity

    250m

    Winding speed

    0~32 m/min

    Total Weight

    138T

    Packaging & Shipping

    Delivery it without package and some parts should be packaged in wooden case.

    And it’s better to delivery it in bulk ship.


    Working case

Send your message to this supplier
To:  

Zhenjiang Zhenzhong Construction Machinery Co.,Ltd

* Content:  

For better quotations, include:

- A self introduction

- Special requests, if any

Quantity:  

  
You May Like
Not exactly what you want? One request, multiple quotations Get Quotations Now >>